Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Worked on the final presentation | Cassio, Sushant, Sameep | 13 hrs | 13 hrs | Completed | Made the necessary changes in the presentation |
Finishing up Develop and User manual | Cassio, Sushant, Sameep | 10 hrs | 12 hrs | Completed | Continuing working on manuals |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Started working on User manual and developers guide | Cassio, Sushant, Sameep | 5 hrs | 5 hrs | Completed | start drafting the content for both manuals |
Setup hadoop and spark on Dr. Sanchez VM | Cassio, Sushant, Sameep | 2 hrs | 2 hrs | Completed | Setup hadoop and spark on the VM |
Hadoop/Spark Recommender | Sameep, Sushant, Cassio | 10 hrs | 10 hrs | Completed | Trying a faster and more reliable algorithm for recommendation |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Finalized and Practice NTASC presentation | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | Final presentation changes, and pratice together |
Hadoop Recommender new Algorithm | Cassio, Sushant | 6 hrs | 6 hrs | Completed | Trying a faster and more reliable algorithm for recommendation |
Spark Recommender new Algorithm | Sameep | 6 hrs | 6 hrs | Completed | Trying a faster and more reliable algorithm for recommendation |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Final draft of SRS poster | Cassio, Sushant, Sameep | 15 hrs | 15 hrs | Completed | Revised, as per feedback by Dr. Payne and Dr. Sanchez. Background removed |
Start NTASC presentation | Cassio, Sameep, Sushant | 5 hrs | 5 hrs | Completed | Basic outline of the presentation |
Fixing bugs on both recommenders | Sushant, Cassio, Sameep | 8 hrs | 8 hrs | Fixed | Trying to fix bugs and improve recommendations |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Start working on SRS poster | Cassio, Sushant, Sameep | 3 hrs | 3 hrs | Completed | Started working on the basic outline of the SRS poster |
K-means for Hadoop | Cassio, Sameep | 3-4 hrs | 3-4 hrs | Fixed | Fixing bugs |
Recommender Hadoop | Sushant, Cassio | 8 hrs | 8 hrs | Fixed | Trying to fix bugs and improve recommendations |
Recommender Spark | Sameep | 8-9 hrs | 8-9 hrs | Partially Fixed | Improve recommendation and scalability problem |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Work on recommender Hadoop | Cassio, Sushant | 12 hrs | 12 hrs | Completed | Trying the recommender for 5+ million records |
Work on recommender Spark | Sameep | 11 hrs | 11 hrs | Completed | Trying the recommender for 5+ million records |
Work on K-means for Spark | Sameep | 5 hrs | 5 hrs | Completed | Writing k-means program and testing on the cluster |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout k-means clustering time tests | Cassio, Sushant | 10 hrs | 10 hrs | Completed | Time statistics noted based on different file sizes |
MLlib Spark recommender using Collabrative filtering | Cassio, Sameep | 15 hrs | 15 hrs | Completed | Recommender performance improvement tests |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout k-means clustering | Cassio, Sushant | 20 hrs | 20 hrs | Completed | Splitting files seperately based on the number of clusters |
MLlib Spark recommender using Collabrative filtering | Cassio | 15 hrs | 15 hrs | Completed | Programming language changed to Python |
MLlib Spark K-means clustering started | Cassio | 5 hrs | 5 hrs | Completed | Initial knowledge gain in Spark clustering |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout Recommender bug testing | Cassio, Sushant | 10 hrs | 10 hrs | Completed | Recommender's performance improved |
MLlib Spark recommender using Collabrative filtering | Cassio, Sameep | 15 hrs | 15 hrs | Completed | Java being used to program the recommender |
Mahout K-means clustering started | Sushant | 8 hrs | 8 hrs | Incomplete | Initial knowledge gain in clustering |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout Recommenders working with hadoop 2 nodes | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | All bugs fixed. Speed and time statistics noted |
MLlib Spark recommenders started | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | Gaining knowledge in the field of recommenders using spark |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout Book review Ch 6 | Cassio, Sushant, Sameep | 15 hrs | 15 hrs | Completed | Mahout recommenders using Hadoop |
Mahout Ch6 Wikipedia data | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | recommenders working on 4 nodes with a few bugs |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout Book review Ch 2,3,4,5,6 | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | Gaining knowledge in the field of recommenders |
Recommenders on Apache Mahout | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Faculty Presentation Delivered | Sushant, cassio, Sameep | 25 minutes | 25 minutes | Completed | |
Mahout Book review Ch 2,3,4,5,6 | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | Gaining knowledge in the field of recommenders |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Hadoop map-reduce job chaining issue fixed | Cassio, Sushant | 20 hours | 20 hours | Completed | |
Faculty Presentation Preparation | Cassio, Sushant | 5 hours | 5 hours | Completed |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Nodes distributed for Hadoop and Spark (2 nodes each) | Sameep | 40min | 30min | Completed | 2 working nodes each for Hadoop and Spark |
Hadoop test runs for word count and Matrix multiplication on cluster | Sushant | 20 hrs | 20 hrs | Completed | Test times noted carefully |
Heap size java exception solved for Spark cluster | Sameep, Cassio | 2 hrs | 2 hrs | Completed | Maximum memory utilization for both nodes |
Spark test runs for word count and Matrix multiplication on cluster | Cassio | 20 hrs | 20 hrs | Completed | Test times noted carefully |
Reading Mahout book ch2,3,4,5,6 for recommender system test | Cassio, Sameep, Sushant | 5 hrs | 8 hrs | Completed |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Hadoop installed on 4 node machines to access HDFS | Cassio, Sushant, Sameep | 6 hours | 6 hours | Completed | |
Cluster set up | Cassio, Sushant | 100 hours | 80 hours | Completed | 4 working nodes |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Project Presentation - Iteration 1 - Delivery | Sameep, Cassio, Sushant | 45min | 50min | Completed | Showed the presentation to class and got proper feedback |
Code Delivery to Dr. Sanchez | Sameep | 2 hrs | 2 hrs | Completed | Created zip file with all code and data used during the semester |
Worked on the Design Document V1.0 | Sushant, Cassio, Sameep | 3 hrs | 3 hrs | Completed | Submitted the document to the client on December 15 |
Website Updates | Cassio, Sameep | 2 hrs | 2 hrs | Completed | Entire semester details updated on the website including Documents and WARs |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Worked on Project Presentation - Iteration 1 | Sameep, Cassio, Sushant | 5 hrs | 4 hrs | Completed | Showed the presentation to Dr. Sanchez on December 14 for suggestions |
Worked on Design Document V1.0 | Sameep | 4 hrs | 4 hrs | In progress | Revising system architeture diagrams |
Setup cluster by connecting to the nodes | Sushant, Cassio, Sameep | 9 hrs | - | Completed | Stoped working by client's request |
One Step matrix multiplication on Spark (5x) | Cassio | 9 hrs | 10 hrs | Completed | Test fully completed |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
One Step matrix multiplication on Spark | Sameep, Cassio | 7 hrs | 8 hrs | Completed | Test fully completed |
Two Step matrix multiplication on Hadoop | Sushant | 8 hrs | 9 hrs | Completed | Test fully completed |
Setup cluster by connecting to the nodes | Sushant, Cassio, Sameep | 9 hrs | 18 hrs | Completed | Trouble to making task trackers to work in sync with job trackers |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Install HDFS on the 4 nodes | Cassio, Sushant & Sameep | 2 hrs | 2 hrs | Completed | |
Setup cluster by connecting to the nodes | Cassio, Sushant & Sameep | 8 hrs | 16 hrs | Completed | Trouble connecting to master correctly. |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Two Step matrix multiplication on Hadoop | Cassio, Sushant & Sameep | 5 hrs | 8 hrs | Completed | Output not displaying properly |
Run wordcount 5x (Hadoop/Spark) | Cassio, Sushant & Sameep | 8 hrs | 12 hrs | Done | All times taken properly |
Run One Step matrix multiplcation 5x (Hadoop) | Cassio, Sushant & Sameep | 15 hrs | 18 hrs | Completed | No comments |
One Step matrix multiplication on Spark | Cassio, Sushant & Sameep | 5 hrs | 9 hrs | Completed | Trouble with RDD functions |
Structuring Requeriments Document v1.2 | Sameep | 2 hrs | 4 hrs | Done | |
One Step matrix multiplication on Java | Sameep | 3 hrs | 3 hrs | Done |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Wordcount on Hadoop | Cassio & Sushant | 10 hrs | 13 hrs | Completed | |
One step matrix multiplication on Hadoop | Cassio & Sushant | 3 hrs | 8 hrs | Completed | |
Use Case Diagrams and Requeriments Document v1.2 | Sameep | 5 hrs | 5 hrs | Completed |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Spark Installation with HDFS | Sameep | 6 hrs | 10 hrs | Completed | |
Java Wordcount | Cassio | 5 hrs | 5 hrs | Completed | Program not complete, bug fixing. |
Requeriment Documents v1.1 | Sushant | 6 hrs | 12 hrs | Completed |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Requirements Document v1.0 | Sushant, Sameep, Cassio | 7 hrs | 8 hrs | Completed | |
Maven Installation, wordcount program. | Sameep, Cassio | 3 hrs | 3 hrs | Completed | Ran a wordcount program into Eclipse and HDFS |
Project Plan v1.1 | Sushant | 2 hrs | 3 hrs | Completed |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Revised Project Plan | Sushant | 3 hrs | 4 hrs | Completed | From V1.0 to V1.1 as per Dr. Payne's suggestions |
Spark Installation | Sameep | 1.5 hrs | 3 hrs | Completed | Sucessful run of sample program. |
Hadoop Installation | Cassio/Sushant | 1.5 hrs | 2 hrs | Completed | Sucessful run of sample program. |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Requirements Document v1.0 | Sushant, Sameep, Cassio | 7 hrs | 8 hrs | Completed | |
Maven Installation, wordcount program. | Sameep, Cassio | 3 hrs | 3 hrs | Completed | Ran a wordcount program into Eclipse and HDFS |
Project Plan v1.1 | Sushant | 2 hrs | 3 hrs | Completed |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Revised Project Plan | Sushant | 3 hrs | 4 hrs | Completed | From V1.0 to V1.1 as per Dr. Payne's suggestions |
Spark Installation | Sameep | 1.5 hrs | 3 hrs | Completed | Sucessful run of sample program. |
Hadoop Installation | Cassio/Sushant | 1.5 hrs | 2 hrs | Completed | Sucessful run of sample program. |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Install HDFS on the 4 nodes | Cassio, Sushant & Sameep | 2 hrs | 2 hrs | Completed | |
Setup cluster by connecting to the nodes | Cassio, Sushant & Sameep | 8 hrs | 16 hrs | Completed | Trouble connecting to master correctly. |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Two Step matrix multiplication on Hadoop | Cassio, Sushant & Sameep | 5 hrs | 8 hrs | Completed | Output not displaying properly |
Run wordcount 5x (Hadoop/Spark) | Cassio, Sushant & Sameep | 8 hrs | 12 hrs | Done | All times taken properly |
Run One Step matrix multiplcation 5x (Hadoop) | Cassio, Sushant & Sameep | 15 hrs | 18 hrs | Completed | No comments |
One Step matrix multiplication on Spark | Cassio, Sushant & Sameep | 5 hrs | 9 hrs | Completed | Trouble with RDD functions |
Structuring Requeriments Document v1.2 | Sameep | 2 hrs | 4 hrs | Done | |
One Step matrix multiplication on Java | Sameep | 3 hrs | 3 hrs | Done |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Wordcount on Hadoop | Cassio & Sushant | 10 hrs | 13 hrs | Completed | |
One step matrix multiplication on Hadoop | Cassio & Sushant | 3 hrs | 8 hrs | Completed | |
Use Case Diagrams and Requeriments Document v1.2 | Sameep | 5 hrs | 5 hrs | Completed |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Spark Installation with HDFS | Sameep | 6 hrs | 10 hrs | Completed | |
Java Wordcount | Cassio | 5 hrs | 5 hrs | Completed | Program not complete, bug fixing. |
Requeriment Documents v1.1 | Sushant | 6 hrs | 12 hrs | Completed |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Project Presentation - Iteration 1 - Delivery | Sameep, Cassio, Sushant | 45min | 50min | Completed | Showed the presentation to class and got proper feedback |
Code Delivery to Dr. Sanchez | Sameep | 2 hrs | 2 hrs | Completed | Created zip file with all code and data used during the semester |
Worked on the Design Document V1.0 | Sushant, Cassio, Sameep | 3 hrs | 3 hrs | Completed | Submitted the document to the client on December 15 |
Website Updates | Cassio, Sameep | 2 hrs | 2 hrs | Completed | Entire semester details updated on the website including Documents and WARs |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Worked on Project Presentation - Iteration 1 | Sameep, Cassio, Sushant | 5 hrs | 4 hrs | Completed | Showed the presentation to Dr. Sanchez on December 14 for suggestions |
Worked on Design Document V1.0 | Sameep | 4 hrs | 4 hrs | In progress | Revising system architeture diagrams |
Setup cluster by connecting to the nodes | Sushant, Cassio, Sameep | 9 hrs | - | Completed | Stoped working by client's request |
ne Step matrix multiplication on Spark (5x) | Cassio | 9 hrs | 10 hrs | Completed | Test fully completed |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
One Step matrix multiplication on Spark | Sameep, Cassio | 7 hrs | 8 hrs | Completed | Test fully completed |
Two Step matrix multiplication on Hadoop | Sushant | 8 hrs | 9 hrs | Completed | Test fully completed |
Setup cluster by connecting to the nodes | Sushant, Cassio, Sameep | 9 hrs | 18 hrs | Completed | Trouble to making task trackers to work in sync with job trackers |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Hadoop map-reduce job chaining issue fixed | Cassio, Sushant | 20 hours | 20 hours | Completed | |
Faculty Presentation Preparation | Cassio, Sushant | 5 hours | 5 hours | Completed |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Nodes distributed for Hadoop and Spark (2 nodes each) | Sameep | 40min | 30min | Completed | 2 working nodes each for Hadoop and Spark |
Hadoop test runs for word count and Matrix multiplication on cluster | Sushant | 20 hrs | 20 hrs | Completed | Test times noted carefully |
Heap size java exception solved for Spark cluster | Sameep, Cassio | 2 hrs | 2 hrs | Completed | Maximum memory utilization for both nodes |
Spark test runs for word count and Matrix multiplication on cluster | Cassio | 20 hrs | 20 hrs | Completed | Test times noted carefully |
Task | Team Member | Est.Time | Actual | Status | Comments |
---|---|---|---|---|---|
Hadoop installed on 4 node machines to access HDFS | Cassio, Sushant, Sameep | 6 hours | 6 hours | Completed | |
Cluster set up | Cassio, Sushant | 100 hours | 80 hours | Completed | 4 working nodes |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout Recommenders working with hadoop 2 nodes | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | All bugs fixed. Speed and time statistics noted |
MLlib Spark recommenders started | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | Gaining knowledge in the field of recommenders using spark |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout Book review Ch 6 | Cassio, Sushant, Sameep | 15 hrs | 15 hrs | Completed | Mahout recommenders using Hadoop |
Mahout Ch6 Wikipedia data | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | recommenders working on 4 nodes with a few bugs |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout Book review Ch 2,3,4,5,6 | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | Gaining knowledge in the field of recommenders |
Recommenders on Apache Mahout | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Faculty Presentation Delivered | Sushant, cassio, Sameep | 25 minutes | 25 minutes | Completed | |
Mahout Book review Ch 2,3,4,5,6 | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | Gaining knowledge in the field of recommenders |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Work on recommender Hadoop | Cassio, Sushant | 12 hrs | 12 hrs | Completed | Trying the recommender for 5+ million records |
Work on recommender Spark | Sameep | 11 hrs | 11 hrs | Completed | Trying the recommender for 5+ million records |
Work on K-means for Spark | Sameep | 5 hrs | 5 hrs | Completed | Writing k-means program and testing on the cluster |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout k-means clustering time tests | Cassio, Sushant | 10 hrs | 10 hrs | Completed | Time statistics noted based on different file sizes |
MLlib Spark recommender using Collabrative filtering | Cassio, Sameep | 15 hrs | 15 hrs | Completed | Recommender performance improvement tests |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout k-means clustering | Cassio, Sushant | 20 hrs | 20 hrs | Completed | Splitting files seperately based on the number of clusters |
MLlib Spark recommender using Collabrative filtering | Cassio | 15 hrs | 15 hrs | Completed | Programming language changed to Python |
MLlib Spark K-means clustering started | Cassio | 5 hrs | 5 hrs | Completed | Initial knowledge gain in Spark clustering |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Mahout Recommender bug testing | Cassio, Sushant | 10 hrs | 10 hrs | Completed | Recommender's performance improved |
MLlib Spark recommender using Collabrative filtering | Cassio, Sameep | 15 hrs | 15 hrs | Completed | Java being used to program the recommender |
Mahout K-means clustering started | Sushant | 8 hrs | 8 hrs | Incomplete | Initial knowledge gain in clustering |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Worked on the final presentation | Cassio, Sushant, Sameep | 13 hrs | 13 hrs | Completed | Made the necessary changes in the presentation |
Finishing up Develop and User manual | Cassio, Sushant, Sameep | 10 hrs | 12 hrs | Completed | Continuing working on manuals |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Started working on User manual and developers guide | Cassio, Sushant, Sameep | 5 hrs | 5 hrs | Completed | start drafting the content for both manuals |
Setup hadoop and spark on Dr. Sanchez VM | Cassio, Sushant, Sameep | 2 hrs | 2 hrs | Completed | Setup hadoop and spark on the VM |
Hadoop/Spark Recommender | Sameep, Sushant, Cassio | 10 hrs | 10 hrs | Completed | Trying a faster and more reliable algorithm for recommendation |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Finalized and Practice NTASC presentation | Cassio, Sushant, Sameep | 10 hrs | 10 hrs | Completed | Final presentation changes, and pratice together |
Hadoop Recommender new Algorithm | Cassio, Sushant | 6 hrs | 6 hrs | Completed | Trying a faster and more reliable algorithm for recommendation |
Spark Recommender new Algorithm | Sameep | 6 hrs | 6 hrs | Completed | Trying a faster and more reliable algorithm for recommendation |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Final draft of SRS poster | Cassio, Sushant, Sameep | 15 hrs | 15 hrs | Completed | Revised, as per feedback by Dr. Payne and Dr. Sanchez. Background removed |
Start NTASC presentation | Cassio, Sameep, Sushant | 5 hrs | 5 hrs | Completed | Basic outline of the presentation |
Fixing bugs on both recommenders | Sushant, Cassio, Sameep | 8 hrs | 8 hrs | Fixed | Trying to fix bugs and improve recommendations |
Task | Team Member | Est. Time | Actual | Status | Comments |
---|---|---|---|---|---|
Start working on SRS poster | Cassio, Sushant, Sameep | 3 hrs | 3 hrs | Completed | Started working on the basic outline of the SRS poster |
K-means for Hadoop | Cassio, Sameep | 3-4 hrs | 3-4 hrs | Fixed | Fixing bugs |
Recommender Hadoop | Sushant, Cassio | 8 hrs | 8 hrs | Fixed | Trying to fix bugs and improve recommendations |
Recommender Spark | Sameep | 8-9 hrs | 8-9 hrs | Partially Fixed | Improve recommendation and scalability problem |